Skip to main content

Welding

Pipe Welding 6G Combination (TIG root, Arc fill and cap)

Offered by Venkat Sai

The combination pipe test many overseas employers use: a TIG root and hot pass, then arc (SMAW) fill and cap, on carbon steel pipe in the 6G position. About 180 hours, in person in Autonagar, Gajuwaka, Visakhapatnam.

Welder in a welding helmet welding a large black steel pipe in a workshop

Overview

A course for welders preparing for 6G combination pipe tests. You put in the root and hot pass with TIG (GTAW), change to arc welding (SMAW) with low-hydrogen electrodes for the fill and cap, and practise the whole joint until it is consistent in the 6G inclined position.

Where: in person at the Venkat Sai Welding Works and Testing Center workshop, Autonagar, Gajuwaka, Visakhapatnam, in small groups with an instructor beside you.

Certificate: learners who complete the course receive a Venkat Sai certificate of completion. The final practical is a Venkat Sai trade assessment; it is not an accredited or third-party certification.

Batches: new batches start through the year. Message us on WhatsApp or call to hear the next start date, timings and fee.

Syllabus

6 modules
  1. Module 1: Pipe preparation, fit-up and tacking

    Bevel angle, root face and gap, alignment and tack welds that hold through the root.

  2. Module 2: TIG root and hot pass

    Keyhole root, even penetration all round, and a hot pass that sets up the fill.

  3. Module 3: Arc fill passes

    Low-hydrogen electrodes, interpass cleaning, heat input and building the joint evenly.

  4. Module 4: Arc capping

    Cap profile and width, tie-ins and avoiding undercut.

  5. Module 5: Working up to 6G

    Full combination joints in the 2G and 5G positions, then the 6G inclined position.

  6. Module 6: Reading a WPS and final test

    What a welding procedure specification asks for, preheat and interpass temperature, and the final 6G combination test piece.

Eligibility

Who can apply
Welders who already weld with TIG and arc and want to pass a 6G combination pipe test for jobs in India or abroad.
Before you start
TIG and arc welding experience on plate or pipe. Our arc and TIG courses are a good starting point.

What you will be able to do

  • Fit up and tack carbon steel pipe ready for a combination joint
  • Run a TIG root and hot pass with even penetration
  • Fill and cap with arc welding to a good profile
  • Follow the main requirements of a welding procedure specification
  • Complete a 6G combination test piece assessed by Venkat Sai

Batches

Dates, venue and seats for each batch. Choose one to apply.

Ask us about the next batch

New batches start through the year. Message us on WhatsApp and we will tell you the next start date, timings and fee.

Ask on WhatsApp (opens WhatsApp)

Your privacy choices

We use essential cookies to keep Venkat Sai Global secure and working. With your permission, we would also like to use optional cookies to remember your settings and to understand how the site is used, so we can improve it. Analytics are pseudonymous and never include what you type into forms.

Cookie policyCookie preferences