Welding
Pipe Welding 6G Combination (TIG root, Arc fill and cap)
Offered by Venkat Sai
The combination pipe test many overseas employers use: a TIG root and hot pass, then arc (SMAW) fill and cap, on carbon steel pipe in the 6G position. About 180 hours, in person in Autonagar, Gajuwaka, Visakhapatnam.

Overview
A course for welders preparing for 6G combination pipe tests. You put in the root and hot pass with TIG (GTAW), change to arc welding (SMAW) with low-hydrogen electrodes for the fill and cap, and practise the whole joint until it is consistent in the 6G inclined position.
Where: in person at the Venkat Sai Welding Works and Testing Center workshop, Autonagar, Gajuwaka, Visakhapatnam, in small groups with an instructor beside you.
Certificate: learners who complete the course receive a Venkat Sai certificate of completion. The final practical is a Venkat Sai trade assessment; it is not an accredited or third-party certification.
Batches: new batches start through the year. Message us on WhatsApp or call to hear the next start date, timings and fee.
Syllabus
Module 1: Pipe preparation, fit-up and tacking
Bevel angle, root face and gap, alignment and tack welds that hold through the root.
Module 2: TIG root and hot pass
Keyhole root, even penetration all round, and a hot pass that sets up the fill.
Module 3: Arc fill passes
Low-hydrogen electrodes, interpass cleaning, heat input and building the joint evenly.
Module 4: Arc capping
Cap profile and width, tie-ins and avoiding undercut.
Module 5: Working up to 6G
Full combination joints in the 2G and 5G positions, then the 6G inclined position.
Module 6: Reading a WPS and final test
What a welding procedure specification asks for, preheat and interpass temperature, and the final 6G combination test piece.
Eligibility
- Who can apply
- Welders who already weld with TIG and arc and want to pass a 6G combination pipe test for jobs in India or abroad.
- Before you start
- TIG and arc welding experience on plate or pipe. Our arc and TIG courses are a good starting point.
What you will be able to do
- Fit up and tack carbon steel pipe ready for a combination joint
- Run a TIG root and hot pass with even penetration
- Fill and cap with arc welding to a good profile
- Follow the main requirements of a welding procedure specification
- Complete a 6G combination test piece assessed by Venkat Sai
Batches
Ask us about the next batch
New batches start through the year. Message us on WhatsApp and we will tell you the next start date, timings and fee.
Ask on WhatsApp (opens WhatsApp)